14.06.2024 High quality works ahead of schedule 19.01.2024 Successful implementation of the project using a 3D survey technology 14.11.2023 Winning of the tender PJSC "UKRNAFTA" 23.10.2023 Field 3D seismic surveys on the Hrudkivska area have been completed 18.09.2023 A design work for the construction (arrangement) of exploratory well 107-Tynivska has completed 24.07.2023 Seismic surveys using 3D survey technology were carried out in the Birkivsko-Zinkivska and Kovalivsko-Sulymivska areas 26.06.2023 Work for the construction of the 3-Zhukovskaya exploratory well has been completed 29.03.2023 The design documentation "Construction (arrangement) of exploratory well 13-Rudnykovskaya" has been developed 10.03.2023 Field 3D seismic surveys were carried out at the Ugnivska 1 site 28.02.2023 Field 2D seismic surveys were carried out at the Ugnivska 1 site 10.02.2023 The design documentation "Construction (arrangement) of exploratory well 71-Semyginivska" was developed 26.12.2022 A design estimates for the construction (arrangement) of wells 550-Bilche-Volytska and 301-Opari has developed 31.10.2022 Design work for the construction of exploration wells has been completed: 24-Gorskaya, 40-Gorskaya 17.10.2022 Field seismic surveys were carried out on the Tynivska area. 27.07.2022 Design work was completed at the Ugnivska 2 (Lypnykivska) site 30.06.2022 Field seismic surveys were carried out at the Ugnivska 3 (Tysovetska) site 13.06.2022 Field seismic surveys were carried out at the Ugnivska 2 (Lypnykivska) area. 16.05.2022 Author's supervision and analysis of the current state of development of the Hirske gas field 20.04.2022 The design work "Construction (arrangement) of the exploration well 11-Sadzhavska" completed 31.03.2022 The design work "Construction (arrangement) of the exploration well 11-Dibrovska" completed 15.03.2022 Field seismic surveys were carried out at the Ugnivska 2 (Lipnykivska) site 30.12.2021 Design work was completed for the construction of exploration wells for 2021 30.11.2021 In order to study the Letnjanska area, 3D field seismic surveys were carried out 19.11.2021 Completed the design work "Construction (arrangement) of the exploration well 10-Dibrovska". 10.11.2021 The design work "Construction (arrangement) of the exploration well 10-Sadzhavska" completed 29.10.2021 Field seismic surveys on the Bilche-Volytska area 15.10.2021 Design and estimate documentation for the construction (arrangement) of well 700-Bilche-Volytska has been developed 30.09.2021 Geological and economic assessment of hydrocarbon reserves of the Zvorivske field has been carried out 29.07.2021 Professional author's supervision were carried out. 23.07.2021 Conducted field seismic surveys at the Ugnivska 5 (Tershakivska) site 09.07.2021 Seismic surveys were carried out on the Kolodnytska area 30.06.2021 Seismic surveys were carried out in the following areas: Ugnivska 6 (Sadzhavska), Ugnivska 4 (Dibrovska). 26.02.2021 Design work has been carried out Increase in natural gas reserves of the Hirske field 28.09.2020 Design work for the construction of exploration wells for 2020 was completed 19.03.2020 Geological exploration in order to study the Gavrilovskaya area 27.02.2020 Seismic surveys were carried out on the Mostyshche-Krekhivska area 20.01.2020 A detailed design has been drawn up for well 1-Zvorivska 26.09.2019 High-quality primary data were obtained after seismic surveys on the Hirska area 28.08.2019 Design work has been carried out Increase in natural gas reserves of the Hirske field 31.07.2019 2D field seismic surveys were carried out on the Bystrytska area 26.07.2019 Pilot development project of the Bunivske field. Commissioned 23.05.2019 2D seismic surveys were carried out on the Rudnikovska area 19.04.2019 Complex of seismic surveys on the Kolod has been completednitskaya area Pages 1 Previous Paged Next